Çolakoğlu Metalurji A.Ş - EAF Building Furnace - Panel - Crucible - Scrap Basket Manufacturing
Project Date |
: |
2006 - 2014 |
Steel Panel Manufacturing |
: |
1.500 Tons |
Copper Panel Manufacturing |
: |
500 Tons |
Scrap Basket and Crucible Manufacturing |
: |
1.200 Tons |
Electric Arc Furnace Mechanical Installation |
: |
2.500 Tons |
Scrap Sorting Plant |
: |
650 Tons |
Gas - Liquid Oxygen Tanks |
: |
300 Tons |
Sand Filter Tanks |
: |
750 Tons |
Tilt Frame Manufacturing |
: |
300 m |
Vacuum Facility |
: |
1.000 Tons |
Crucible Furnace |
: |
500 Tons |