Industrial Facility Projects
Çolakoğlu Metalurji A.Ş - EAF Building Furnace - Panel - Crucible - Scrap Basket Manufacturing
| Project Date |
: |
2006 - 2014 |
| Steel Panel Manufacturing |
: |
1.500 Tons |
| Copper Panel Manufacturing |
: |
500 Tons |
| Scrap Basket and Crucible Manufacturing |
: |
1.200 Tons |
| Electric Arc Furnace Mechanical Installation |
: |
2.500 Tons |
| Scrap Sorting Plant |
: |
650 Tons |
| Gas - Liquid Oxygen Tanks |
: |
300 Tons |
| Sand Filter Tanks |
: |
750 Tons |
| Tilt Frame Manufacturing |
: |
300 m |
| Vacuum Facility |
: |
1.000 Tons |
| Crucible Furnace |
: |
500 Tons |